Grand Hôpital de Charleroi – Terril
Grand Hôpital de Charleroi - Terril Location: Gilly-Charleroi Leveling of the ground and flattening of the terril (slag heap). Duration of the capture : 7 Months • Client: GHdC • Builder: Wanty
5ème Élément
5ème Élément - Phase déconstruction Broucheterre Location: Charleroi Demolition of the old SEM building (Equipment and Maintenance Department), The former SEM lived more than a century: after hosting an orphanage, he converted to a school complex for the Garenne. Duration of the capture : 3 Months • Client: La Sambrienne • Builder: Eloy
Gare de Namur – Rampe
This project is in progress and the video is not yet available Gare de Namur - Rampe et passerelle haubanée Location : Namur From Leopold roundabout, a cable-stayed ramp will give access to the new bus station. Depuis le rond-point Léopold, une rampe haubanée donnera accès à la nouvelle gare des bus. Start of the [...]
L’Alliance (Phase 2)
L'Alliance - Phase 2 Location : Braine l'Alleud Located in a vast 8 hectare landscaped park, the first three residential buildings of L’Alliance project totaling 58 apartments. Situé dans un vaste parc paysager de 8 hectares, les trois premiers immeubles résidentiels de ce projet totalisent 58 appartements. Start of the capture : September 2018 • [...]
Swimming Pool
Piscine communale de Braine l'Alleud “Site Paradis” Location : Braine l'Alleud New swimming pool inscribed perfectly in the pole "leisure and relaxation". 35m x 20.5m sports pool, mobile fund, mobile pontoon. Nouvelle piscine inscrite parfaitement dans le pôle "loisir et détente" du lieu-dit "Le Paradis". Bassin sportif 35m x 20,5m, fonds mobiles, ponton mobile. Start of [...]
Tunnel Reyers
This project is in progress and the video is not yet available Tunnel Reyers (Renovation) Location : Brussels Roof renovation of the 6 Reyers Tunnels. Sealing works as well as concrete laying. Start of the capture : January 2018 • Client: Brussels Mobility • Builder: Bam Contractors
Bières de Chimay (Inside)
Bières de Chimay (Inside) Location : Chimay Implementation of the new production line. Start of the capture : • Client: Bières de Chimay • Builder: Krones